Results 1011 to 1020 of 3642 for “safety orientation for contractors”

This document provides a comprehensive report on a company's activities throughout the preceding year.

Since entering service in 2008, the Millennium Pipeline has delivered natural gas, provided jobs and supported local economies throughout the state of New York.

The Nisga’a Nation confirmed its Benefits Agreement with Prince Rupert Gas Transmission Ltd (PRGT) to provide right of way certainty for its proposed LNG pipeline project from northeastern British Columbia to the proposed Pacific NorthWest LNG export facility at Lelu Island near Prince Rupert.

This document provides a comprehensive report on a company's activities throughout the preceding year.

Great Lakes Gas Transmission is a 2,115-mile (3,404-km) natural gas pipeline system that transports Canadian natural gas to the U.S. Midwest.

Carseland Cogeneration Plant has been providing Alberta with up to 95 megawatts of electricity from its industrial cogeneration plant in Carseland, Alberta. It supplies power to Nutrien’s Carseland Nitrogen Operation as well as needed support for the Southern Alberta electrical grid.

Connecting to virtually every major pipeline in the U.S. Gulf Coast and additional Midwestern lines, TC Energy’s Columbia Gulf Transmission System (CGT) ensures energy reaches where it’s needed most, adapting to evolving energy demands and shifting environmental priorities.

The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.