Leming Lake Sand Section Project

Power icon
A natural Gas project

Built to ensure ongoing safe and reliable energy delivery, TC Energy’s NGTL System delivers energy to millions of North Americans every day as an essential part of the TC Energy pipeline network.

As part of enhancing natural gas transportation to meet growing demand to Alberta’s Oil Sands, NGTL GP has constructed the Leming Lake Sales Lateral Loop (Sand Section) Project.

The Leming Lake Sand Section Project is a 20-inch diameter, 18 km pipeline located on Crown Land approximately 60 km northwest of Bonnyville, Alberta. The Project was installed adjacent to the existing NGTL pipeline in the right-of-way, increasing capacity while minimizing environmental and land disturbances.

The Leming Lake Sales Lateral Loop Sand Section Project is now in-service.

Learn more about how the project supported local communities and economic growth in Northern Alberta.

Down arrow

Fact & Figures

Down arrow
Responds to growing demand in Alberta’s Oil Sands
Down arrow
Enhances secure and reliable energy transportation
Down arrow
Footprint minimizes land and environmental disturbances

View the fact sheet

Project timeline

Engagement start

Q3 2024

Project notification submitted to the Canada Energy Regulator (CER) 

October 2024

Section 214 application filed with the CER

January 2025

CER approval

August 2025

Clearing work and anticipated construction start 

Q4 2025

Project in-service

Q1 2026

Community benefits

The Project delivered well-designed and constructed infrastructure that provides short-term and long-term economic benefits and strengthens the economy on a local, provincial and national level.

Employment opportunities — Construction required the services of equipment operators, welders, mechanics, truck drivers, labourers and more. 

Business opportunities  — Pipeline construction created demand for local goods and services, including food and accommodation, hardware, industrial parts, automotive parts and servicing, fuel and more.

Annual revenue to support local services — Project construction resulted in tax payments to municipal, provincial and federal governments. The operational project will contribute to annual tax payments to help support schools and hospitals, emergency services, recreation facilities, recycling programs and other local programs vital to sustaining communities.

Investments in local communities — Through our engagement with local communities, we identified areas where we can help build stronger, more vibrant communities through initiatives with community partnerships in the areas of safety, community and environment.

Environmental considerations

TC Energy is committed to protecting the environment.

As part of project planning and development, NGTL prepared an Environmental and Socioeconomic Assessment (ESA). We collected data on a number of environmental elements including, but not limited to, soils and terrain, wildlife and wildlife habitat, vegetation and wetlands, fish and fish habitat, heritage resources, air emissions and acoustic environment, and socioeconomic considerations such as land and resource use, infrastructure and services, and social and cultural well-being.

In addition, an Environmental Protection Plan (EPP) was developed to identify the necessary environmental protection measures to be implemented for the Project, which ensures responsible construction and results in a return to equivalent land capability. 

Working with Indigenous groups

We welcomed input and support from Indigenous groups to identify specific concerns, environmental sensitivities and culturally important areas along potential route options. We provided opportunities to Indigenous groups to provide feedback throughout engagement and during the regulatory process.

Learn more about how we work with Indigenous groups.

Safety is our number one value

For 75 years, TC Energy has been a leader in the safe and reliable operation of North American energy infrastructure. From design and construction, to operations and maintenance, safety is integral to everything we do. The Project was designed, constructed and operated in a safe and environmentally responsible manner.  

Learn more about our safety practices.

How are we regulated?

The Leming Lake Sand Section Project is a part of the NGTL System which is governed according to regulations outlined by the Canada Energy Regulator (CER)

Visit Website

Canada Energy Regulator (CER)

Ways to reach us

We’re here to answer your questions. For general questions you can contact us by email, but for a quicker response, please call us directly.

Public Affairs
450 - 1 St. S.W.
Calgary, Alberta
T2P 5H1
TOLL-FREE 1-855-895-8754
Media Relations
TOLL-FREE 1-800-608-7859
Investor Relations
TOLL-FREE 1-800-361-6522
Emergency Response
Our commitment to the safety of our pipelines and facilities is unwavering. In case of an emergency, visit our Contact page for our complete list of emergency numbers.
Landowner Helpline
A key component in maintaining the integrity of our facilities is input from stakeholders: Indigenous groups, landowners and governments. If you have questions or concerns, please let us know.
Head Office
450 - 1 St. SW
Calgary Alberta
T2P 5H1
TOLL-FREE 1-866-372-1601