Central Virginia Capacity Project
A proposed natural Gas project
TC Energy’s Columbia Gas Transmission system has been a part of Virginia’s energy backbone for decades, delivering affordable natural gas across Virginia and the broader region since the 1950s. The company currently operates approximately 1,200 miles of pipeline, 12 compressor stations and 225 meter stations in Virginia.
The Central Virginia Capacity Project (“Project”) would deliver additional natural gas capacity to support the energy requirements associated with EdgeCore Digital Infrastructure’s planned development within the Shannon Hill Regional Business Park in Louisa County, Virginia. The Project provides the transportation infrastructure to facilitate the power generation necessary to serve growing energy demand in Virginia, including the anticipated energy needs of EdgeCore’s development. The Project is also expected to deliver additional reliability and operational benefits to the existing natural gas pipeline system.
The pipeline Project is fully funded—meaning no costs will be borne by utility customers while generating an estimated 486 jobs, $172 million in economic output and $6.4 million in tax revenue in Virginia.
It is being developed with a distinctive community-first approach and designed to align with local priorities—primarily utilizing existing pipeline and infrastructure corridors to minimize the need for new disturbance, protect environmental resources and preserve the area’s historical character. Phase 1 includes approximately 15.75 miles of 30-inch diameter pipeline alongside an established pipeline route, one new metering and regulating station, and associated facilities capable of delivering up to 390,000 Dth/d of incremental natural gas capacity. Phase II includes facility modifications to the existing Boswells Tavern Compressor Station and construction of a regulator station tie-in to the existing system.
Fact & Figures
Prioritizes community-first approach
Utilizes primarily existing pipeline corridors
Creates long-term economic benefits
Project timeline
FERC Filing (Completed)
Q4 2026
Anticipated FERC Certificate
Q4 2027
Begin Pre-Construction Work
Q4 2027
Begin Pipeline Construction
Q1 2028
Pipeline In-Service
Q3 2028
Begin Facility Construction
Q4 2029
Facility In-Service
Q4 2030
NOTE: Dates shown are based on current understanding of the facts and are subject to change.
Community Investment
The Project is being developed in alignment with Louisa County’s long-term economic development goals and supports the County’s efforts to attract and advance high-tech industrial developments that deliver a high tax yield while limiting impacts on the local community. The broader development will support investment, jobs and future tax revenue to directly benefit local residents in the form of strengthened county finances, funding of capital needs, and preservation of rural assets.
The project is estimated to support 486 jobs, $172 million in economic output, and $6.4 million in tax revenue in Virginia.
During construction, the project is expected to generate approximately $111 million in economic activity in Louisa County, support 262 jobs and contribute $3.7 million in state and local tax revenue. Once operational, this project is anticipated to generate approximately $860,000 annually in local tax revenue.
We have a strong record of ongoing community engagement and support in Virginia. Since 2021, TC Energy has invested more than $2.8 million in Virginia communities through its Community Investment program, supporting safety, education, environmental and local initiatives. Visit TCEnergy.com/BuildStrong to learn more and apply for funding.
FAQ
Who is TC Energy and what do you do?
We build and operate safe and reliable energy infrastructure. This includes our 58,100-mile network of natural gas pipelines, which supplies more than 30 percent of the clean-burning natural gas consumed daily across North America to heat homes, fuel industries and generate power. With our presence across the continent, we also support jobs and create long-term economic opportunities. Our people play an active role in building healthy, vibrant and prosperous communities. We’re proud of how our hard work and commitment sets us apart and benefits society, every day.
How will the Project benefit Louisa County and the local community?
The Project is being developed in alignment with Louisa County’s long-term economic development goals and supports the County's efforts to attract and advance high-tech industrial developments that deliver a high tax yield while limiting impacts on the local community. The broader development will support investment, jobs and future tax revenue in the form of strengthened county finances, funding of capital needs, and preservation of rural assets. During construction, the project is expected to generate approximately $111 million in economic activity in Louisa County, support 262 jobs and contribute $3.7 million in state and local tax revenue. Once operational, this project is anticipated to generate approximately $860,000 annually in local tax revenue.
How will TC Energy engage with stakeholders and protect local resources?
We are committed to engaging early and often throughout the Project life cycle. The Project has been submitted for independent review by the Federal Energy Regulatory Commission, and will work with other federal and state agencies to secure the necessary permits and approvals. Before construction begins, extensive reviews and management plans will help consider and protect environmental resources, communities and landowners, while minimizing traffic, land disturbance and impacts to important local and historical resources.
How are we regulated?
The Central Virginia Capacity Project is governed according to regulations outlined by the U.S. Federal Energy Regulatory Commission (FERC). It is also subject to rules and regulations of the Department of Energy (DOE) administered by the Pipeline and Hazardous Materials Safety Administration (PHMSA) and Environmental Protection Agency (EPA).
Columbia Gas Transmission will modify the existing minor source air permit for Boswells Tavern Compressor Station (Registration No. 40790) to incorporate the new Project equipment while maintaining the facility’s minor source status. An application for this modification was submitted to the Virginia Department of Environmental Quality.
Federal Energy Regulatory Commission
Ways to reach us
We’re here to answer your questions. For general inquiries, please contact us via email. If you require a more immediate response, please call us directly.
To learn more about the Central Virginia Capacity Project, the community is invited to attend an open house event on Dec. 7, 2026, from 5-7 p.m. at the Betty Queen Center located at 522 Industrial Drive, Louisa, VA 23093.
Write to us
700 Louisiana Steet
Houston, Texas 77002