Results 1 to 10 of 3575 for “ngtl gas transportation tariff”
CER Tariff No. 55 – International Joint Rate Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
The NGTL System can be the start of moving a molecule of gas from northeast B.C. to Mexico City. Is the NGTL System a part of your life?
FERC No. 7.26.0 International Joint Rate Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
CER Tariff No. 50 – Petroleum Toll Schedule Containing Tolls Applying to the Transportation of Petroleum (effective January 1, 2021)
NGTL GP is proposing to permanently cease operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
FERC No. 2.42.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
CER Tariff No. 54 – Petroleum Toll Schedule Containing Tolls Applying to the Transportation of Petroleum (effective January 1, 2022)