Results 741 to 750 of 1501 for “contractor safety orientation”
The Foothills Natural Gas Pipeline System ships WCSB natural gas to the U.S. border for export.
The Topolobampo Pipeline is a 560 km (348 mile) pipeline that connects the states of Chihuahua and Sinaloa, supplying numerous Mexico communities along the way.
The Redwater Cogeneration Plant, located at Williams Energy Canada Fractionation and Storage Plant in Redwater, Alta., has provided the province with approximately 46 megawatts of electricity since 2001.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oil sands development, 60 km (37 miles) west of Fort McMurray, Alta.
Located in the community of Grande Prairie, Alberta, Bear Creek Cogeneration Plant produces up to 100 megawatts of electricity to both Weyerhaeuser’s Grande Prairie Pulp and Sawmill and Alberta’s competitive electricity market.
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.
The Sur de Texas Pipeline supplies natural gas generation plants in Tamaulipas and Veracruz, as well as some regions of the East, West and Central Mexico.
From end to end, the Tula Pipeline Project is 287 km (178 miles) in length and will deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo. The pipeline has the capacity to carry 886 million cubic feet per day of natural gas.
tce-2025-q2-results-presentation.pdf