1. EN
  2. FR
  3. ES

MacKay River Plant

Overview

MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta. The cogeneration plant is an integral part of Suncor’s bitumen extraction facilities.

The project uses a General Electric 7FA combustion turbine equipped with a dry low NOx combustion system to maximize fuel efficiency and minimize air emissions.

In order to deliver the large quantities of steam required by Suncor, the MacKay River project uses one of the largest Enhanced Oil Recovery HRSGs ever built.

TransCanada Energy Ltd participates in Alberta’s competitive electricity market.

An integral part of Suncor’s bitumen extraction facilities

Natural gas-fired combustion turbine

Produces steam for injection wells

 

Documents and maps

The MacKay River Cogeneration Plant located near Fort McMurray, Alta., is part of Suncor’s bitumen extraction facilities. The plant also produces close to 200 megawatts of energy for Alberta communities.

Filter by
 

How are we regulated?

TC Energy's Alberta power-generation plants and business is governed according to regulations outlined by the Alberta Utilities Commission (AUC).

 

Ways to reach us

If you have any questions about the Project, please reach out to us via the contact information below. 

MacKay River Plant (TC Energy)

 

MacKay River Plant (TC Energy)
450 – 1 St. SW
Calgary, Alberta
T2P 5H1

 

Jamie Hodel, Site Manager

Emergency Response
Our commitment to the safety of our people, pipelines and facilities is unwavering, visit our Contact page for our complete list of emergency numbers.
Media Relations
TC Energy welcomes enquiries from media. Please direct questions to:
1-800-608-7859 Toll-free (North America)
Investor Relations
We welcome inquiries from analysts, shareholders and prospective shareholders at: 
1-800-361-6522 Toll-free (North America)