Results 1 to 10 of 4089 for “ngtl general terms and conditions”
NGTL GP Abandonment Program (2026)
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
TC Energy — Legal notices
Please read our terms and conditions before accessing our site.
NGTL GP Decommissioning Program (2026)
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
TC Energy Focused on Meeting Generational Demand
We’re seeing generational demand across our systems—driven by rising power demand, industrial development and LNG growth. The fact of the matter is natural gas demand is growing faster than infrastructure can be built.