Results 731 to 740 of 3786 for “right of way maps”
FERC No. 2.43.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 6.71.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 7.26.0 International Joint Rate Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
The 266 km (165 mile) south section of the Peace River Mainline (part of the NGTL System) will be retired.
tc-nky-gate-enhancement-fact-sheet-june-2024.pdf
tc-north-montney-mainline-commitment-tracking-no-69
FERC No. 2.42.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
CALGARY, Alberta, March 12, 2020 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) today announced that its wholly owned subsidiary, NOVA Gas Transmission Ltd. (NGTL), has executed an exclusive letter of intent with Tidewater Midstream and Infrastructure Inc. and TransAlta Corporation to purchase the Pioneer Pipeline for $255 million. The Pioneer Pipeline consists of 131 km of operating pipeline that, upon closing of the transaction, will be integrated...
FERC No. 6.70.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
CER Tariff No. 54 – Petroleum Toll Schedule Containing Tolls Applying to the Transportation of Petroleum (effective January 1, 2022)