Results 691 to 700 of 1507 for “support”
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
The fact sheet describes key points about safety around TransCanada pipelines.
2024-tcpl-third-quarter-report.pdf
In cooperation with a First Nations resident, TransCanada unearthed a 13,000 year old artifact in BC, Canada.