Results 621 to 630 of 1313 for “ngtl map”
This pipeline expansion project in western Alberta expanded pipeline capacity for the transportation of natural gas to growing markets located in central and southern Alberta from the Peace River Project Area.
The proposed McLeod South Project is 48-inch diameter pipeline that would be located entirely within Yellowhead County, Alberta.
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
The proposed Leming Lake Sand Section Project is a 20-inch diameter, 18 km pipeline located on Crown Land approximately 60 km northwest of Bonnyville, Alberta
TC Energy’s Virginia Reliability Project (VRP) would replace an existing segment of the Columbia Gas Transmission (TCO) Pipeline System to ensure reliable and abundant natural gas supply. TCO has been providing energy to the Hampton Roads region for more than 70 years, and as demand for natural gas rises across the region, these important updates will improve natural gas reliability and help meet the current and future needs of the Hampton Roads region.
Learn more about TC Energy's federally regulated End of Life Cycle Program with the Canada Energy Regulator (CER).