Showing results 551 to 560 of 2041 for “project 2030”
CALGARY, Alberta – Aug. 4, 2022 – News Release – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy or the Company) and the CFE, Mexico’s state-owned electric utility, have agreed to forge a strategic alliance to accelerate the development of natural gas infrastructure in the central and southeast regions of Mexico.
This winter, more homes can be heated, and more power will be available to public buildings and industry with additional natural gas following completion of the West Path Delivery 2023 Projects.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
News Release – TC Energy Corporation today announced that it will proceed with construction of the Keystone XL Pipeline Project (the Project), resulting in an investment of approximately US$8.0 billion into the North American economy.