Results 41 to 50 of 422 for “prairie”
TC Energy added multiple natural gas pipelines and compressor unit additions as part of the 2021 NGTL System Expansion Project in Alberta.
The proposed Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition will increase natural gas transportation service on our existing natural gas pipeline system in Alberta to meet growing demand.
Landowner Relations.pdf
A new application of an existing technology has been tested and will be implemented by the Coastal GasLink Facilities Engineering team to reduce methane emissions on the project’s compressor and meter stations.
The fact sheet describes key points about Bear Creek Cogeneration Plant.
TCEnergy-Alberta-Tier3-Emergency-Response-Plans.pdf