Results 451 to 460 of 1919 for “mxp project”
TC Energy Corporation (TSX, NYSE: TRP) (TC Energy or the Company) released its fourth quarter results today. François Poirier, TC Energy’s President and Chief Executive Officer commented, “By remaining focused on a clearly defined set of priorities emphasizing project execution, safety and operational excellence, we delivered record operational performance and financial results....
tce-hire-buy-local.pdf
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
tce-C29491-1_NGTL_West_Path_Delivery_2023__-_Condition_22_Commitments_Tracking_Table_No._4.pdf