Results 411 to 420 of 1642 for “contact email”

The Alberta Carbon Grid (ACG) is a carbon transportation system reaching the province’s largest sources of industrial emissions. Designed to be an open-access system, the ACG will serve as the backbone of Alberta’s emerging carbon capture utilization and storage (CCUS) industry, connecting the Fort McMurray region, the Alberta Industrial Heartland, and the Drayton Valley region to key sequestration locations and delivery points across the province, and serving multiple industries. When fully constructed, the system will be capable of transporting more than 20 million tonnes of carbon dioxide (CO2) annually.

Commitment Tracking Table No. 9

We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.

Commitment Tracking Table No. 6

2021 NGTL System Expansion — Commitment Tracking Table No. 19