Results 391 to 400 of 1789 for “safety policy”
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
We don’t have a monopoly on good ideas for pipeline safety and as an organization, we are able to design and build better projects by using the feedback we get from industry, government, landowners, Indigenous communities and regulators. Constructive feedback is an important tool for growth... Ongoing compliance with approval conditions by our regulator is just one step in ensuring we do that each and every day.
CALGARY, ALBERTA--(Marketwire - Aug. 5, 2010) - TransCanada (TSX:TRP) (NYSE:TRP) has withdrawn its request to the Pipeline and Hazardous Materials Safety Administration (PHMSA) for a special permit. The permit would have allowed TransCanada to operate the proposed Keystone XL pipeline at a slight...