Results 31 to 40 of 153 for “empleos chihuahua ”

Mazatlan Pipeline Map
The Mazatlan Pipeline Project has 430 km (267 miles)of pipeline in length. It's estimaed to carry 202 million cubic feet per day of natural gas.

TC Energy — Mazatlán Pipeline Project
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.

Política de Investigación de Antecedentes.pdf
Política de Investigación de Antecedentes.pdf

Mazatlan Pipeline Map — 2017
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.