Results 371 to 380 of 1521 for “supply chain”
TC Energy — Saddle Lake Lateral Loop Project
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
tce-corporate-profile.pdf
tce-corporate-profile.pdf
Board of Directors — Kevin E. Benson — Bio
Age: 71, City: Calgary, Alberta, Canada, Director Since: 2005
TransCanada Pipelines Ltd — Management’s Discussion and Analysis — 2008
This MD&A covers TCPL’s financial position and operations as at and for the year ended December 31, 2008.