Showing results 3721 to 3730 of 4177 for “ngtl point to point service”
The 560 km (348 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
The Tamazunchale Pipeline is a 370 km (230 miles) natural gas pipeline, comprised of two segments: Naranjos – El Sauz (130 km) and Tamazunchale - El Sauz, better known as the Tamazunchale Extension (240 km). The pipeline serves communities on the East Coast of Mexico and Central Mexico.
The 560 km (348 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta.
Bear Creek is an industrial cogeneration plant situated on International Paper Grande Prairie pulp mill and Weyerhaeuser saw mill complex. The power plant is configured around a 58 MW natural gas fired turbine.
The Foothills System is a 1,241 km (771 mile) long network of pipelines comprising the Foothills B.C. and Foothills Saskatchewan lines.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.