Results 341 to 350 of 1156 for “ngtl maps”
CALGARY, ALBERTA--(Marketwired - Aug. 6, 2013) - TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) announced today that its wholly-owned subsidiary, NOVA Gas Transmission Ltd. (NGTL), has signed agreements with Progress Energy Canada Ltd. (Progress) for approximately two bil...
TC Energy Corporation announced today that it has approved two new expansion projects totaling $1.3 billion on its wholly-owned natural gas pipeline systems. The $0.9 billion 2023 NGTL Intra-Basin System Expansion will deliver natural gas from the Western Canadian Sedimentary Basin (WCSB) to markets within Alberta on the NOVA Gas Transmission Ltd. (NGTL) System, while the US$0.3 billion Alberta XPress project will see the expansion of the ANR Pipeline (ANR) to provide a seamless path for Canadian production to access growing LNG export and other markets along the U.S. Gulf Coast.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
This submission describes the Commitment Tracking Table No. 10 dated from September 2, 2015 to November 30, 2017 for the Towerbirch Expansion Project.
The North Corridor Expansion Project in northwestern Alberta expanded pipeline capacity for the transportation of natural gas from the Peace River Project Area (PRPA) to growing markets located in northeastern Alberta. The Project included three pipeline components and one compressor station unit addition.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.