Results 3171 to 3180 of 3798 for “safety orientation for contractors”
The Canadian Mainline pipeline is 4,114 km (8,770 mile) in length and has safely carried natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond throughout its history.
The Keystone Pipeline System stretches 4,324 km (2,687 miles) in length delivering crude oil supplies from Alberta, Canada to Texas, United States.
Bear Creek is an industrial cogeneration plant situated on International Paper Grande Prairie pulp mill and Weyerhaeuser saw mill complex. The power plant is configured around a 58 MW natural gas fired turbine.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta.
The map depicts the location the Redwater Cogenerating Station which is north of Alberta's provincial capital, Edmonton Alberta.
Prince Rupert Gas Transmission is a proposed 900 km (559 mile) pipeline that will deliver natural gas from a point near Hudson’s Hope to the Pacific NorthWest LNG Facility near Prince Rupert, B.C., Canada.
Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico.
The 560 km (348 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
The Tamazunchale Pipeline is a 370 km (230 miles) natural gas pipeline, comprised of two segments: Naranjos – El Sauz (130 km) and Tamazunchale - El Sauz, better known as the Tamazunchale Extension (240 km). The pipeline serves communities on the East Coast of Mexico and Central Mexico.