Results 3091 to 3100 of 3712 for “safety orientation for contractors”
View and download photos from TC Energy to use in stories or publications.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
The Sundre Crossover Project involved the construction of approximately 21 kilometres (km) of 42-inch diameter pipeline in Mountain View County, east of the town of Sundre, Alberta.
The Grand Rapids Pipeline System is delivering crude oil on behalf of our customers. Jointly owned by TransCanada and PetroChina Canada Ltd., formerly Brion Energy Corporation, the 460 km (287 mile) Grand Rapids Pipeline System plays a key role in connecting producing areas northwest of Fort McMurray, Alta., to terminals in the Edmonton/Heartland region.