The inclusion of LNG Canada’s Phase 2 on the government's nation-building projects list reflects the essential role energy infrastructure plays in Canada's economic sovereignty and energy security.
TCEnergy-Quebec-Tier3-Emergency-Response-Plans.pdf
48-inch diameter (NPS 48) pipeline expansions and a meter station expansion and were placed in-service between ... British Columbia Section Commenced and completed meter station construction activities on the NGTL West
NGTL GP is proposing to permanently cease operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
Located in British Columbia’s Peace River Regional District, the North Montney Mainline (NMML) provides the critical natural gas transmission infrastructure required to connect natural gas producers and downstream markets throughout Canada and the United States, generating tax revenues for hospitals, schools and more in some of B.C.’s more remote communities.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
The Heartland Project will help meet the market demand of natural gas and increase reliability on the existing ANR pipeline.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
TQM_Compliance_Filing_-COM_and_SIPP_-_A4F2Y3.pdf