Showing results 251 to 260 of 3914 for “jobs in 2025”
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
The future is nuclear. Bruce Power is a crucial part of Ontario’s clean energy grid, past, present and future. Learn more in the latest Annual Review and Energy Report.
TC Energy is disappointed that the Tribunal constituted to hear the company’s claim to recover more than US$15 billion in damages resulting from the revocation on Jan. 20, 2021 of the Presidential Permit for the Keystone XL Project has determined in a jurisdictional ruling that the claim cannot proceed.
At TC Energy, we are committed to building long-lasting partnerships that strengthen and uplift our local communities.