Results 221 to 230 of 1572 for “safety fall”
tce-bod-bio-dawn-leach.pdf
tce-industrial-hygiene-standard-for-prime-and-non-prime-contractors-can.pdf
Edson Mainline Expansion Project – Commitment Tracking Table No. 5
Edson Mainline Expansion Project – Commitment Tracking Table No. 8
tc-elt-bio-tina-faraca.pdf
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).