Results 2181 to 2190 of 4213 for “ngtl terms and conditions”
tce-VisonforNAEnergy_ExecBiographies.pdf
FERC No. 6.72.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective March 1, 2022)
Marketlink transports shipments of U.S. crude oil from Cushing, Okla., to refineries in the U.S. Gulf Coast via the Keystone Pipeline System’s Gulf Coast extension. Delivery points include Sour Lake, Houston, and Port Arthur, Texas.
The fact sheet describes key points about Redwater Cogeneration Plant.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta.