Results 2101 to 2110 of 3915 for “jobs in 2025”
The Sur de Texas Pipeline supplies natural gas generation plants in Tamaulipas and Veracruz, as well as some regions of the East, West and Central Mexico.
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
Edson Mainline Expansion Project – Commitment Tracking Table No. 1