Results 1991 to 2000 of 3545 for “tariff columbia gas”
Ce rapport annuel est un rapport complet sur les activités d’une entreprise au cours de l’année précédente.
The Coastal GasLink natural gas pipeline project will run approximately 670 km (416 miles) in length from Dawson Creek to a facility near Kitimat, B.C.
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
Pipelines are the safest, most environmentally friendly way to transport natural gas and petroleum products. Find out how we do it.
The first segments of pipe for Coastal GasLink arrived at storage sites in Kitimat and Chetwynd last week in anticipation of construction ramp up later next year. Deliveries to other areas across the project route will continue through April 2021 by vessel, rail or truck, until it’s needed for assembly and installation. That phase of construction is expected to start next summer and continue through to 2022.
The fact sheet describes key points about Bear Creek Cogeneration Plant.
2023-tcpl-first-quarter-report.pdf
Coastal GasLink takes local first responders on right-of-way safety tour
CALGARY, Alberta, June 23, 2025 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX:TRP) (NYSE:TRP) (TC Energy or the Company) today announced that 104,778 of its 9,997,177 fixed rate Cumulative Redeemable First Preferred Shares, Series 3 (Series 3 Shares) have been elected for conversion on June 30, 2025, on a one-for-one basis, into floating rate Cumulative Redeemable First Preferred Shares, Series 4 (Series 4 Shares); and 1,822,829 of its 4,002,823 Series 4 Shares have been elected for...