Results 11 to 20 of 965 for “welding procedures”
Critical infrastructure investments completed with over $18 million in local subcontracts to connect Alberta’s economy to the energy it needs.
Columbia Gulf Transmission, LLC (CGT) promptly activated its emergency response procedures to address a fire at its Corinth Compressor Station in Mississippi resulting from a suspected lightning strike during severe storms occurring early on April 28, 2023. No one was injured in the incident, and the fire has now been extinguished. We appreciate the support and prompt collaboration from local fire and emergency personnel.
The Tula - Villa de Reyes (TVDR) Project stretches over 420 km in the heartland of Mexico, including mountain ranges and several river crossings, which have put to test not only the technical skills, but also the safety procedures of both TC Energía and our contractors. Despite some challenges, TC Energía’s team has achieved over 1.6 million hours without recording a lost-time incident. Learn how it was done.
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
tce-TES-CT-ITP-GL-Inspection-Test-Plan-Specification-for-Construction-and-Fabrication-(CAN-US-MEX)-1.pdf
Edson Mainline Expansion Project – Commitment Tracking Table No. 23