Results 161 to 170 of 3342 for “yuma pipeline project”
The proposed Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition will increase natural gas transportation service on our existing natural gas pipeline system in Alberta to meet growing demand.
CALGARY, Alberta, July 02, 2023 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy or the Company) announced today that the Delaware Chancery Court (the “Court”) issued a ruling against TC Energy in a class action lawsuit brought on behalf of the former shareholders of Columbia Pipeline Group Inc. ("Columbia") related to the acquisition of Columbia by TC Energy in July 2016. TC Energy strongly disagrees with the Court’s ruling and is evaluating its options for appeal...
TC Energy’s Wisconsin Reliability Project (“WR Project” or “Project”) is a set of expansion and reliability projects that will involves replacing 54.4 miles of pipeline along the ANR Pipeline System in South Wisconsin and Northern Illinois to provide needed natural gas supply to meet the increasing market demand of residential, commercial and industrial consumers.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
tc-factsheet-virginia-reliability-project.pdf