Results 161 to 170 of 1913 for “mxp project”
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
CALGARY, Alberta, Oct. 29, 2020 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) announced today that it will move forward with its Wisconsin Access Project to increase natural gas capacity, improve reliability, and reduce emissions on a highly utilized segment of its ANR Pipeline system. The US$0.2 billion project will provide approximately 72 million cubic feet per day of firm transportation service under long-term contracts to utilities serving the...
TransCanada today announced its Sundre Crossover Project has been placed into service in central Alberta, increasing the company’s capacity to transport natural gas on TransCanada’s NOVA Gas Transmission Ltd. (NGTL) System to downstream pipelines and key markets in the Pacific Northwest and California.
The fact sheet describes key points about Proposed Project: West Path Delivery Project for NGTL system.