Results 1581 to 1590 of 4238 for “pipeline terms and conditions”
The proposed Project consists of two pipeline components which would add up to approximately 85 kilometres (km) of newly constructed 48- inch pipe to the NGTL System, as well as a compressor station unit addition.
State’s energy future strengthened by company’s $700 million investment in growth and reliability.
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 9 for the Project. The reporting period for this submission is September 29, 2017 to October 27, 2017.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.