Results 1361 to 1370 of 3602 for “columbia gas transmission tariff”
Marketlink FERC No. 2.80.0 Rate Schedule.pdf
This pipeline expansion project in western Alberta expanded pipeline capacity for the transportation of natural gas to growing markets located in central and southern Alberta from the Peace River Project Area.
The North Corridor Expansion Project in northwestern Alberta expanded pipeline capacity for the transportation of natural gas from the Peace River Project Area (PRPA) to growing markets located in northeastern Alberta. The Project included three pipeline components and one compressor station unit addition.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 9 for the Project. The reporting period for this submission is September 29, 2017 to October 27, 2017.
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this third submission is May 15, 2015 to October 15, 2015.