Results 1191 to 1200 of 4035 for “one of the most robust we have seen in decades”
Supply Chain manager Eric Hermanns shares the importance of inclusivity and belonging in the workplace.
Ensuring the integrity of our pipeline assets is one of our main objectives when we talk about our safety as a core value. It becomes a challenge when we must make it real in our 92,600 km (57,500 miles) network of natural gas pipelines. These plastic slabs are just as efficient as concrete to avoid third-party mechanical, but with additional benefits. Its high visibility colour allows our patrolling team to easily spot any exposed section in the pipeline and quickly reveals the existence of a high-pressure pipeline to any third party performing unauthorized activities over the pipeline.
Notice of 2021 annual meeting and notice of availability of meeting materials (Registered Shareholders)
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is May 15, 2017 to June 15, 2017.