Results 111 to 120 of 226 for “maps”
NGTL System (24,631 km) is connected to one of the largest supply basins on the continent, the Western Canadian Sedimentary Basin (WCSB).
tce-c250505_nce_cond13-16_commitment_tracking_table_no_26.pdf
tce-C23743-1_2021_NGTL_System_Expansion_-_Condition_16_and_14_Commitments_Tracking_Table_No._31_-_A8L2A9.pdf
The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.
The Topolobampo Pipeline is a 560 km (348 mile) pipeline that connects the states of Chihuahua and Sinaloa, supplying numerous Mexico communities along the way.
Iroquois is a 414-mile (666-km) interstate natural gas pipeline system that extends from the Canadian border to Commack and the Bronx, NY.
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
TC Energy Gas Storage Partnership manages a portfolio of strategically located natural gas storage facilities in Alberta, Canada, connected to the Nova Inventory Transfer (NIT) market hub via the NGTL System. These are the Crossfield and Edson Gas Storage facilities. TC Energy’s unregulated gas storage business is operated independently from its regulated affiliates.