Results 1181 to 1190 of 3187 for “anr pipeline”
tce-FERC-6.92.0-TransCanada-Keystone-Rate-Schedule.pdf
The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.
NGTL is proposing to permanently cease operations at seven meter stations and 37 lateral pipelines, loops and/or producer tie-ins on the NGTL
NEB Tariff No. 34 – Petroleum Toll Schedule Containing Tolls Applying to the Transportation of Petroleum (effective January 1, 2019)
Sixty years ago, TransCanada recruited a "highly-trained crew of experts from around the world" to operate Station 41 and ensure its reliability. Today, that crew is made up of local, expertly trained technicians, who share the same values and dedication to the safe and reliable operation of TransCanada's namesake pipeline.