Results 91 to 100 of 1156 for “west virginia jobs”

June 19 was an ordinary day at the Bickers Compressor Station in Virginia. Ordinary in that it marked the station’s 10,000th consecutive day without a recordable injury as defined by the U.S. Occupational Safety and Health Administration. That means there hasn’t been a work-related injury or illness resulting in medical treatment beyond first aid or days away from work since 1993.

2021 Meter Stations and Laterals Abandonment Program Map

The map depicts route of Coastal Gaslink west of Dawson Creek to Kitimat, BC.

VANCOUVER, BRITISH COLUMBIA--(Marketwire - June 5, 2012) - TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) is pleased to announce that it has been selected by Shell Canada Limited (Shell) and its partners to design, build, own and operate the proposed Coastal GasLink proje...

The Leach XPress Pipeline is unique because of the terrain and the sheer amount of work that up to 3,000 employees and contractors will carry out to complete this project for a planned in-service date in November.

How Canadian energy can help strengthen Canada’s economic sovereignty.

With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.

The Line 8000 Replacement Project, part of TransCanada’s Columbia Gas Transmission Modernization Program, will replace approximately 13 miles (21 km) of existing 12-inch-diameter bare steel pipeline with new coated steel pipeline.