Results 1 to 10 of 4200 for “ngtl terms and conditions”
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
Please read our terms and conditions before accessing our site.
The document describes terms of reference for the President and Chief Executive Officer of TC Energy.
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
NGTL GP is proposing to permanently cease operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
tce-C23743-1_2021_NGTL_System_Expansion_-_Condition_16_and_14_Commitments_Tracking_Table_No._31_-_A8L2A9.pdf