Results 831 to 840 of 2035 for “wr project”
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
Pembina Pipeline Corporation and TC Energy Corporation are pleased to share their plan to jointly develop a world-scale carbon transportation and sequestration system which, when fully constructed, will be capable of transporting more than 20 million tonnes of CO2 annually. By leveraging existing pipelines and a newly developed sequestration hub, the Alberta Carbon Grid ("ACG" or the "Project") represents the infrastructure platform needed for Alberta-based industries to effectively manage their emissions and contribute positively to Alberta's lower-carbon economy and create sustainable long-term value for Pembina and TC Energy stakeholders.
AUSTIN, TEXAS--(Marketwire - Sept. 27, 2011) - TransCanada's (TSX:TRP) (NYSE:TRP) Vice President, U.S. Pipeline Operations, along with other supporters of the project, will speak with the media about why the Keystone XL pipeline is fundamental to supporting energy security and job gr...
tce-accessibility-plan_ES-EN.pdf