Results 811 to 820 of 1536 for “safety fall”
tc-equal-employment-opportunity-and-non-discrimination-policy.pdf
The fact sheet describes key points about Vaughan Mainline Expansion Project.
Learn how a "crazy idea" from front-line TransCanada employees to run a PIG (Pipeline Inspection Gauge) almost 1,000 kilometres in a gas pipeline energized the workforce to overcome challenges and resulted in a North American record and a new standard in gas pipeline.
Commitment Tracking Table No. 22
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
AMHERST, SOUTH DAKOTA--(Marketwired - Nov. 16, 2017) - News Release - TransCanada (TSX:TRP) (NYSE:TRP) crews safely shut down its Keystone pipeline at approximately 6 a.m. CST (5 a.m. MST) after a drop in pressure was detected in its operating system resulting from an oil leak that i...
This pipeline expansion project in western Alberta expanded pipeline capacity for the transportation of natural gas to growing markets located in central and southern Alberta from the Peace River Project Area.
2021 NGTL System Expansion — Commitment Tracking Table No. 20
2021 NGTL System Expansion — Commitment Tracking Table No. 15