Results 771 to 780 of 3760 for “sign in”
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
tce-CER-No.-70-Keystone-IJT-Rates-Schedule.pdf
tce-FERC-2.68.0-Marketlink-Rate-Schedule.pdf
tce-Marketlink-FERC-3.34.0-Rate-Schedule.pdf
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.