Results 751 to 760 of 1376 for “safety inspector”
TC Energy — Edson Mainline Expansion Project
This pipeline expansion project in western Alberta expanded pipeline capacity for the transportation of natural gas to growing markets located in central and southern Alberta from the Peace River Project Area.
TransCanada Responds to Oil Leak in Amherst, South Dakota
AMHERST, SOUTH DAKOTA--(Marketwired - Nov. 16, 2017) - News Release - TransCanada (TSX:TRP) (NYSE:TRP) crews safely shut down its Keystone pipeline at approximately 6 a.m. CST (5 a.m. MST) after a drop in pressure was detected in its operating system resulting from an oil leak that i...
How we see inside our pipes with intelligent machines
"We do in-line inspections periodically and it gives us an overall health of the pipeline,” John Sadler, Manager of In-line Inspection Canada at TC Energy.
tce-energy-2024-q1-results-presentation.pdf
tce-energy-2024-q1-results-presentation.pdf
OGMP-reassessment-report-2025.pdf
OGMP-reassessment-report-2025.pdf