Results 741 to 750 of 1948 for “open season northern border”
TC Energy Corporation (today announced that it has submitted its formal application to the Federal Energy Regulatory Commission (FERC) for approval of the Virginia Reliability Project (Docket No. PF22-3-000/CP22-503).
The Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition are part of TC Energy’s continued investment in the NGTL System to expand capacity, support system growth and meet growing demand for natural gas in Alberta.
tce-c250505_nce_cond13-16_commitment_tracking_table_no_26.pdf
The Canadian Chamber of Commerce has announced François Poirier, our President and CEO, as a recipient of the 2026 Canadian Business Leader of the Year award.
tce-leming-lake-sand-fact-sheet.pdf
Trans Québec & Maritimes Pipeline (TQM) has been operational since 1982 and has operated a gas transmission system since 1982. The pipeline connects with the Canadian Mainline near the Ontario/Québec border to transport natural gas to the Montréal and Québec City corridor, and interconnects with the Portland Natural Gas Transmission System from the Northeast US.