Results 641 to 650 of 1375 for “safety ”
This pipeline expansion project in western Alberta expanded pipeline capacity for the transportation of natural gas to growing markets located in central and southern Alberta from the Peace River Project Area.
The Coastal GasLink natural gas pipeline project will run approximately 670 km (416 miles) in length from Dawson Creek to a facility near Kitimat, B.C.
The fact sheet describes key points about continually improving the integrity and reliability of TransCanada’s pipelines and it's assets. This is TransCanada’s highest priorities.
tce-visionforNAEnergy.pdf
AMHERST, SOUTH DAKOTA--(Marketwired - Nov. 16, 2017) - News Release - TransCanada (TSX:TRP) (NYSE:TRP) crews safely shut down its Keystone pipeline at approximately 6 a.m. CST (5 a.m. MST) after a drop in pressure was detected in its operating system resulting from an oil leak that i...