Results 601 to 610 of 1297 for “ngtl map”
This week, TC Energy completed in-creek recovery of the released volume and continues progressing restoration activities.
Gary Calliou of Kelly Lake Cree Nation is making a difference through his opportunity in the Aboriginal Construction Participation Program (ACPP), playing a key role in pipeline construction in Alberta and B.C.
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
The proposed Leming Lake Sand Section Project is a 20-inch diameter, 18 km pipeline located on Crown Land approximately 60 km northwest of Bonnyville, Alberta