Results 581 to 590 of 2399 for “ngtl system”
The NKY Gate Enhancement Project aims to modernize the acquired system and meet the growing natural gas demand in the region.
A new application of an existing technology has been tested and will be implemented by the Coastal GasLink Facilities Engineering team to reduce methane emissions on the project’s compressor and meter stations.
tce-agm-2026-presentation.pdf
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
TC Energy Executive Vice President and Chief Operating Officer, Natural Gas Pipelines, Tina Faraca, issued the below statement following passage of the Standardizing Permitting and Expediting Economic Development (SPEED) Act in the U.S. House of Representatives.