Results 541 to 550 of 1754 for “mexico 2021”
tc-politica-de-gestion-de-contratistas.pdf
Nikola and TC Energy announce a strategic collaboration aimed at the development, construction, ownership and/or operation of critical hydrogen infrastructure for hydrogen fueled zero-emission heavy-duty trucks.
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.
The 86-mile (138-km) North Baja Pipeline System delivers natural gas produced from West Texas and the Rocky Mountains region to markets in both the Western U.S. and Mexico.
Natural Gas is a critical component of any strategy to meet North America’s long-term energy needs and has contributed to reduced greenhouse gas emissions across the continent. The Gas Transmission Northwest XPress Project (GTNXP) is designed to upgrade our system to meet increased demands from our customers in the region, providing the reliable energy to communities throughout the Western U.S. in a safe, responsible, and reliable manner. Gas Transmission Northwest, an interstate natural gas pipeline owned and operated by TC Energy, filed an application before the Federal Energy Regulatory Commission (FERC) in October 2021. Further information regarding GTNXP may be found in a copy of the application filed with FERC.