Results 511 to 520 of 3245 for “coastal gas link commercial”
NGTL GP Abandonment Program (2026)
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
TC Energy | South Bow Spinoff
Resources to learn more about the TC Energy Liquids business spinoff. Driving energy transition and supporting global energy security.
Line 8000 Replacement Project Map
The Line 8000 Replacement Project, part of TransCanada’s Columbia Gas Transmission Modernization Program, will replace approximately 13 miles (21 km) of existing 12-inch-diameter bare steel pipeline with new coated steel pipeline.
Management's Discussion and Analysis — 2017
This document provides an overview of the key factors that have influenced how TransCanada has performed in its recent past, its financial condition, and its future prospects.