Results 501 to 510 of 3815 for “the government of the united states of america”
tce-personal-protective-equipment-en.pdf
tce-CPOC-Combined-Financial-Statements-Q2-2024.pdf
tce-corporate-profile.pdf
HOUSTON, June 11, 2020 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) and the TC Energy Foundation are proud to announce the donation of US$50,000 to the University of Houston’s College of Natural Sciences and Mathematics (NSM) to support a summer program that enables high school students interested in science, technology, engineering or math (STEM) majors to prepare for the transition to college. The intensive, nine-week program, TC Energy Summer...
tce-ZPLCFERC-16.6.0-JT.pdf
tce-Keystone-FERC-7.36.0-IJT-Rate-Schedule.pdf
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.