Results 491 to 500 of 1992 for “indigenous legacy contact”
Mary shares how change, connection and active learning shaped five decades at TC Energy.
NGTL encloses its Commitment Tracking Table No. 1. This submission is in response to both Section 52 Condition 6 and Section 58 Condition 7 located in Appendices II and III of the Report.
The NKY Gate Enhancement Project aims to modernize the acquired system and meet the growing natural gas demand in the region.
tce-esg-investor-pack.pdf
Trans Québec & Maritimes Pipeline (TQM) has been operational since 1982 and has operated a gas transmission system since 1982. The pipeline connects with the Canadian Mainline near the Ontario/Québec border to transport natural gas to the Montréal and Québec City corridor, and interconnects with the Portland Natural Gas Transmission System from the Northeast US.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 8 for the Project. The reporting period for this submission is September 1, 2017 to 28, 2017.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 5 for the Project. The reporting period for this submission is June 1, 2017 to June 29, 2017.