Results 41 to 50 of 3962 for “orientations for contractor site”
Project Details, Schedule, Map, Technology, Design, Emissions Reduction Alberta, Regulatory Process, Site Selection, Engagement, Construction, Benefits, Environment and Contact Information
tce-c250505_nce_cond13-16_commitment_tracking_table_no_26.pdf
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
SDS for Natural Gas
CALGARY, Alberta, Dec. 31, 2025 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX:TRP) (NYSE:TRP) (TC Energy) today announced that it does not intend to exercise its right to redeem its Cumulative Redeemable First Preferred Shares, Series 5 (Series 5 Shares) and Cumulative Redeemable First Preferred Shares, Series 6 (Series 6 Shares) on Jan. 30, 2026. As a result, subject to certain conditions: (a) the holders of Series 5 Shares have the right to choose one of the following options with...
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.